New Britain Township will contain approximately 3.5 miles of water main from edge of the township line with Chalfont on Park Avenue to Ferry Road and then northeast on Ferry Road to Plumstead Township at Swamp Road (Route 313).  Work in this area is expected to start in the spring of 2021 and the area will be effected with several rotating detours as each section of the project is constructed.  (See detour Map 2 for work area depicted in Map 5 and detour Map 3 for all work in area Maps 6 – 9) . The water main throughout the project will be a sixteen (16) inch ductile iron pipe which has proven the test of time to provide a superior quality and durability.  This paragraph and map below will be updated at the appropriate time of when the contract is awarded to a qualified bidder.

Close Menu